Siddaramaiah launches work on 9.33-km stretch of ORR

Thursday, 07 November 2013 05:56 administrator
Print

The Hindu             07.11.2013

Siddaramaiah launches work on 9.33-km stretch of ORR

Special Correspondent

The 9.33-km stretch of the Outer Ring Road (ORR), connecting Bannur Road to Nanjangud Road, may finally be ready by next year. Chief Minister Siddaramaiah launched the work at Bannur Road junction here on Wednesday.

Though the total length of the ORR is 41.5 km, a stretch of 32.2 km was developed and the remaining stretch was left incomplete. MUDA had initially planned to take up the work on the 9.33-km stretch after upgrading the remaining stretch into six lanes.

Mysore Urban Development Authority (MUDA), which developed the ORR to ease traffic congestion inside the city and provide better connectivity to residential localities on the outskirts, is taking up the work at a cost of Rs. 54.09 crore. The majority of the funding has come from the Jawaharlal Nehru National Urban Renewal Mission.